Project:
Clean Storm Drains and Flooded Culverts below Railroad Tracks
Approach:
Utilize EPCE Combination Cleaning Trucks and walk behind loaders to restore Drains.
Result:
All drains and culverts restored to 100 % capacity
Project Photos: Before and After
BEFORE
AFTER
AFTER
BEFORE
AFTER
BEFORE
During
During
EQUIPMENT
BEFORE
During
After
After
BEFORE
